Construction Safety

Electrical Testing

09. Electrical Testing

09. Electrical Testing It is more likely that this will happen during electrical testing and fault finding, when conductors at dangerous voltages are often exposed. You can minimise this risk if testing is done while the equipment is isolated from any dangerous source of supply, although this is not always possible. Take care to prevent […]

09. Electrical Testing 더 읽기"

Electrical Installation

08. Electrical Installation

08. Electrical Installation Electrical installations consist as the connection system that has the mission to conduct and distribute the electric current, from the electric service to the last electrical installation outlet, in a edification or construction. Electrical installation describes the physical work involved in installing electrical systems into a building and a plant., etc as

08. Electrical Installation 더 읽기"

Cable Pulling, Installation and Banding

06. Cable Pulling, Installation and Banding

06. Cable Pulling, Installation and Banding Cable pulling works involve an individual pulling sheathed cables through walls, trays and ducts for electrical power systems. They will push, pull, and band these cables through given spaces, as well as joining them together. ∴ 케이블 풀링, 설치 공사는 혼자하기 어려운 작업입니다. 한팀을 이루어 작업을 진행하고, 풀링할 때에 구호를 넣어 구호에 맞춰 케이블을 끌어당기고 고정하기도 합니다. 케이블을

06. Cable Pulling, Installation and Banding 더 읽기"

Backfilling Work

04. Backfilling Work

04. Backfilling Work Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling. ∴

04. Backfilling Work 더 읽기"

Asphalt Paving

03. Asphalt Works

03. Asphalt Works   Asphalt paving works is a composite material commonly used to surface roads, parking lots, airports and other such places. It lays the asphalt flat and provides minor compaction before it is compacted by a roller. ∴ 아스팔트 공사하는 모습을 운전하시면서 종종 보셨을 거예요. 많은 건설장비가 투입되어 장비사고 위험이 높습니다. 사용 중인

03. Asphalt Works 더 읽기"

Air Flushing

02. Air Flushing

Air flushing provides an efficient method of removing debris from pipelines and newly constructed systems. ∴ In the gas process lines, the velocity should be the lowest figure between 60 m/s and the velocity obtained at 1.3 time the maximum process flow rate. The minimum velocity should be 30 m/s. In liquid process lines, a

02. Air Flushing 더 읽기"

Air Blowing Test

01. Air Blowing Test

01. Air Blowing Test Air Blowing can be used as a safer, more environmentally friendly and cost effective alternative to conventional cleaning and steam blowing. The purpose of air blowing is to remove loose scale and debris prior to start up using compressed air as the cleaning medium. The velocity of a large air mass

01. Air Blowing Test 더 읽기"