Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling.
∴
주유원이 굴삭기에 주유를 하고 주유호스를 정리하고 있었습니다. 굴삭기 운전원이 소변을 보고 돌아와서 주유가 끝났다고 단순히 생각하고 스윙을 하였습니다. 스윙하는 버킷에 주유원이 부딪쳐 사망한 사고가 있었습니다.
자주 근로자 분들에게 말씀드립니다. “굴삭기 운전원을 믿으면 안됩니다”.
‘내가 여기 있는 것을 운전원은 알겠지‘라는 생각은 버려야 합니다.
나의 안전을 누구에게 의지해서는 안됩니다. 나의 안전은 내가 지켜야죠!!
굴삭기를 보면 그 버킷의 사이즈를 통해 능력(Capacity)를 흔히 10, 08, 06, 04, 02 라고 이야기 합니다. 10은 1m3을 의미하죠. 10 굴삭기를 가까이 보면 굉장한 힘이 몸소 느껴집니다.
∴
∴
Hazard Category | Hazards | Controls |
Collapse | 1. Lack of soil investigation
2. Who don’t comply with procedures | 1. Conduct a soil test to identify what type of soil to be excavated used sloping, benching, shoring, to avoid cave in. 2. Excavated area shall be provide physical barricaded & signages. 3. Excavated soil/sand is to be maintained 1 meter away from the edges of the excavation. including any type of equipment. |
Electrocution or existing equipment or materials damage | 1. Failure to perform a survey for any presence of under ground | 1. Identify and marked all under ground cables and plumbing line prior to start the trenching. 2. Survey the area if any presence of under ground utilities power cable, pipelines |
Slip, Trip, and Fall | 1. Lack of arrangement or storage materials in neat orderly manner | 1. All materials, tools & equipment shall be stored in tidy manner & the site/work shop should be cleaned as the work progress 2. Remove dunnage, banding, crate material, nails etc. and dispose property |
Collision | 1. Can occur that an excavator and personnel is involved in a collision | 1 Excavated area shall be provide physical barricaded to guard from falling hazard. 2. Supervisor and flag man shall be control the equipment operation for excavation and back filling works 3. Proper signs shall be placed near excavation to alert the surrounding employees 4. Provide ramp in proper angle for access/egress to the excavation |
Fatal or Injury | 1. Improper equipment movements | 1. Only certified and experienced operator shall be operate the equipments 2. All heavy equipment shall be provided with seat belt and use while operating 3. Back-up alarm shall be provided to alert the employees while reversing the equipment 4. After finish the removal of fence the excavation will be backfilled as soon as possible |
Aware of Inadequate activity | 1. Lack of communication between worker parties | 1. Secure and apply all PTW support documents prior to start the job 2. Conduct safety TBM and discuss the JSA & procedure to start of work 3. All personnel must wear the appropriate PPE for their specific task 4. Work force has good understanding of task and working to the approve JSA and permit requirement |
∴
제주도 서쪽 비양도라는 섬이 있습니다. . 비양도는 제주시 한림읍 비양리 위치해 있으며, 하늘에서 날오온 섬이라는 의미를 지니고 있습니다. 비양도는 한림항에서 약 1.1km 떨어져 있으며, 섬의 모양은 원형에 가깝고 약 2000여명의 주민이 거주하고 있습니다. 비양도의 중앙에는 해발 114m 높이의 비양봉 본석구가 있고, 서쪽 해안에는 제주도에서 가장 큰 초대형 화산탄들이 분포하고 있습니다. . 섬의 북쪽 해안에는 호니토(homito)로 알려진 굴뚝모양의 바위들이 약 20여기 분포하고 있다. 호니토는 용암이 흐르다가 습지 등의 물을 만나 수증기와 용암이 뒤섞여 분수처럼 솟구쳐 나와 쌓여 만들어졌으며, 천연기념물 제439호로 지정되어 있습니다. . 섬의 동쪽에는 펄렁못 엄습지와 마을 신당이 위치해 있습니다. 최근까지 비양도는 약 1,000년 전에 분출한 섬으로 알려져 왔으나 용암의 나이를 분석한 결과 27,000년 전에 형성된 것으로 조사되었습니다. . …