Risk Assessments

37. Piping or Equipment Installation

37. Piping or Equipment Installation

Please refer to the 36. Piping Installation in JSA (위험성평가).

Hazard Category Hazards Controls
Injury to personnel or property damage 1. Can occur that do not comply with PTW or procedures 1. Obtain correct permit to work, task supercisor to conduct TBM on daily basis and discuss all relevant hazard to the job and the JSA and sign attendance sheet

2. Confirmed that procedures and all associated documents are approved and available 

Falls of Person 1. Every employee can get serious by falling man or object 1. Appropriate PPE such as safety helmet, safety glass, gloves and safety shoes shall be worn by all employees.

2. All workers that will go on elevated area (1.5 meters) must wear full body harness and always 100% tie-off 

3. Ensure proper wind-up and housekeeping at work place. All work area is to be kept clean and free from tripping hazards. 

4. All unused materials shall be lowered to ground after the work is completed. 

Lacerations, Bruising 1. Can occur that are struck by hand tools 1. Hand tools are only to be used for their intended purpose, no improvised tools  on site.

2. Used the correct tools, size and type for the job. 

3. Inspect tools regularly for sign of damage or wear. ensure that any worn or damage tools are withdrawn from service and replaced. 

4. Never use attachment for leverage unless specifically design for its use. 

5. Tools are to be secured by wrist straps or lanyard where there is a risk of falling from height. Never throw tools. 

Failure to mobilize men and material 1. Can occur that engaging unskilled and inexperienced workers or use of defective tools and equipment. 1. Hired skilled and experienced workers who must undergo HSE induction by HSE personnel.

2. Inspect tools, maintain color coding and discard damage tools. 

3. Ensure that all workers know control method of tools and equipment. 

4. Ensure effective supervision and conduct thorough inspection. 

Faulty Lifting Equipment 1.Rigging failure, swinging, rigging overload, failure of sling due to cutting by sharp end of the load.
2. Inadequate crane positioning
1. Documented monthly inspection and inspection prior to use, two tag lines must be used, rigging size for intended load and rigging configuration.

2. Used of softener in every rough or sharp edges. 

3. Crane must position on stable ground and put the  outrigger pad. 

4. Crane out-rigger must be on the top of the beam so that the weight will be on the beam. 

Falls of Personnel 1. Lack of experience on the man lift operator. 1. 100% tie-off is a “must” when working in elevated platform, wear full body harness when working at 1.8 meter and above.

2. Daily inspection chechlist of man lift must be filled up before operation. 

3. Be sure on the anchorage point, if installed life line it must be tested that it capable to bear a 500lbs load. 

Fire 1. Damage eye sight from cutting chips, sparks and grinding particles, fire from the ignition source during hot works. pinch point. 1. Use of proper PPE for the hot work activity.

2. Face shield with the correctly tinted screens and always double eye protection used of safety glass and welding mask. Hot work must be done where possible away from potential fuel source. 

3. Work strictly in accordance with the hot work permit condition. 

4. Have a suitable fire extinguisher available. 

Failure of Using Lifting Gears 1. Used of insufficient lifting gear with low capacity 1. Provede a safe anchorage for the chain block. Keep away from pitch point area.

2. Used only an approved lifting gear that was assigned to use by a competent person only. 

3. Attached the chain block in an apporoved anchorage point 

JSA를 활용하실 때에 다른 작업에 관한 사항도 같이 참조가 필요합니다.

전반적으로 관련된 단위작업 확인해보시길 바랍니다.

감사합니다.

kassy

Recent Posts

푸꾸옥 여행 Tip.

베트남에 놀러간다면,  푸꾸옥을 놀러간다면 즐거운 여행에 첨가되는 라면스프 같은 소스를 소개합니다. 1. 라오몽 사오또이 동남아…

2일 ago

[20년만의] 마카오 야경

마카오 관광에서 가장 인상 깊다면 야경을 뽑을 수 있습니다. 남쪽 Cotai 지역만 이동하다보니 그렇게 느꼈을지…

6일 ago

비양도

제주도 서쪽 비양도라는 섬이 있습니다. .  비양도는 제주시 한림읍 비양리 위치해 있으며, 하늘에서 날오온 섬이라는 의미를 지니고 있습니다. 비양도는 한림항에서 약 1.1km 떨어져 있으며, 섬의 모양은 원형에 가깝고 약 2000여명의 주민이 거주하고 있습니다. 비양도의 중앙에는 해발 114m 높이의 비양봉 본석구가 있고, 서쪽 해안에는 제주도에서 가장 큰 초대형 화산탄들이 분포하고 있습니다. .  섬의 북쪽 해안에는 호니토(homito)로 알려진 굴뚝모양의 바위들이 약 20여기 분포하고 있다. 호니토는 용암이 흐르다가 습지 등의 물을 만나 수증기와 용암이 뒤섞여 분수처럼 솟구쳐 나와 쌓여 만들어졌으며, 천연기념물 제439호로 지정되어 있습니다. .  섬의 동쪽에는 펄렁못 엄습지와 마을 신당이 위치해 있습니다. 최근까지 비양도는 약 1,000년 전에 분출한 섬으로 알려져 왔으나 용암의 나이를 분석한 결과 27,000년 전에 형성된 것으로 조사되었습니다. . …

3주 ago

조용한 숲속, 원주 감악산

원주에 감악산을 다녀왔습니다. 강원도는 정말 등산을 가는 드라이브 코스부터 산과 계곡이 함께하기 때문에 설레임을 더해줍니다.…

3주 ago

비자림

자연이 살아있는 천년의 숲 비자림 제주 평대리 비자나무 숲 제주 평대리 비자나무 숲(비자림)은 한라산 동쪽에서…

1개월 ago

천연기념물 제420호, 성산일출봉

제주 동쪽 여행의 필수코스. 4년 전, 제주에 놀러왔는데 도착하고 태풍이 올라오고 있었습니다. 섭지코지의 문어빵을 무조건…

1개월 ago