▶ All lifting devices and every part thereof must be in good mechanical operating condition, free from defect
▶ Lifting devices are properly inspected, maintained, and affixed with certifications stickers
▶ All operators must possess a valid natioinal specific license and be certified by Organization
▶ All riggers must be certified by Organization
All lifting equipment used must have valid test certificate
of competency to any approved third party inspections and certification
All operators carry out a daily pre-operational
inspection on all crane & lifting equipment listed
A copy of the manufacturer’s operator’s manual must be abailable
1. All crane lifts must have a trial lift prior to the actual lift
2. Engineer must investigate the stability and bearing capacity of the soil to locate a crane
3. Before beginning any crane operation, All employees related must have a tool box meeting
4. Establish barriers and boundaries
5. Suitable knot-free and defect-free lines must be used to control suspended loads
6. No crane must operate closer than 6 meters to power lines unless such line have been isolated or insulated by Organization
7. Welding or modification on load hooks and other lifting equipment is strictly forbidden
8. Any load that keeps eight-five percent(85%) of the crane’s rated load capacity or manufacturer’s specifications for that specific lift
9. Must be equipped with properly working Rated Capacity Load Limiters (RCLs) and anti two-block devices or two-block damage prevention features for all points of two blocking
10. Standard must not be performed in wind speeds exceeding 9m/s
11. All cranes must have their safe working load rating clearly visible
12. When outriggers are used, They shall be extended or deployed according to the crane load rating chart specifications
13. Crane windows must be clean all times during the work
14. Use of any mobile phone function is strictly prohibited during operations
15. The crane operator must not leave the controls at any time while a load is attached
Any crane working near energized powr-lines
All critical lifts require an approved Lift Plan
All wire rope slings must be manufactured, inspected, and load tested by a recognized manufacturer with SWL (Safe Working Load)
– Damaged wire rope sling must be destroyed at the site
– All employees comply with Color Coding procedure
* Rigging Protectioni from Cutting or Slipping
Hooks must be fitted with a safety latch on the hook opening or the hook must be designed
so that the slings cannot be escaped
▶ Recognize load description & Safety equipment (=device) before use it
▶ Judge a center of loads & load’s information such as length, weight etc.
▶ Perform to select the most safety method of lifting
제주도 서쪽 비양도라는 섬이 있습니다. . 비양도는 제주시 한림읍 비양리 위치해 있으며, 하늘에서 날오온 섬이라는 의미를 지니고 있습니다. 비양도는 한림항에서 약 1.1km 떨어져 있으며, 섬의 모양은 원형에 가깝고 약 2000여명의 주민이 거주하고 있습니다. 비양도의 중앙에는 해발 114m 높이의 비양봉 본석구가 있고, 서쪽 해안에는 제주도에서 가장 큰 초대형 화산탄들이 분포하고 있습니다. . 섬의 북쪽 해안에는 호니토(homito)로 알려진 굴뚝모양의 바위들이 약 20여기 분포하고 있다. 호니토는 용암이 흐르다가 습지 등의 물을 만나 수증기와 용암이 뒤섞여 분수처럼 솟구쳐 나와 쌓여 만들어졌으며, 천연기념물 제439호로 지정되어 있습니다. . 섬의 동쪽에는 펄렁못 엄습지와 마을 신당이 위치해 있습니다. 최근까지 비양도는 약 1,000년 전에 분출한 섬으로 알려져 왔으나 용암의 나이를 분석한 결과 27,000년 전에 형성된 것으로 조사되었습니다. . …