10. Excavation Work

Being a major part of the site preparation, excavation can make or break the stability of your future building.

First things first. Do not commence any excavation work before you have a clear map of underground utilities: cables, pipes, etc. Mark the services and make sure everyone in the excavation team knows where the buried services are. Also, test the soil and conduct site evaluation.
Armed with this information, you will be able to choose methods and safety measures that fit specific excavation works.

Hazard Category Hazards Controls
Collapse of Trench Walls 1. Can occur if the soil in the walls is unable to support its own weight, if soil is full of sand pockets, If soil is broken down by rain, frost, etc. and/or by vibration from machinery nearby. 1. Trenches shall be securely boarded in line with current acops (i.e. poling board, cross struts, and walings).

2. A site survey shall be carried out prior to excavating to establish possible weaknesses in the soil caused by previous excavations, etc.

Falls of Equipment/ Machinery and/or Plant into Excavation 1. Can occur if equipment/machinery and/or plant are located too close to the excavation or if operational plant
(such as dumper diggers, etc.) drive or reverse into the excavation.
1. Supervisors shall ensure all equipment/ machinery and/or plant located a suitable distance away from the excavation “so far as is reasonably practicalble”.

2. Supervisors shall ensure personnel operating machinery. (i.e. dumper, diggers, etc.) are aware of the potential risks, remain vigilant at all times and are competent.

Spillage 1. Can occur if suitable means of crossing the excavations are not provided such as man made bridges or suitable barriers are not erected around the excavation to prevent personnel from straying too near the edge of the excavation. 1. Walkovers shall be provieded across the excavation at predetermined points with handrails (if reasonalbly practicable).

2. Barriers shall be erected along/around the whole length of the excavation and signs displayed advising personnel of the potential hazard.

Damage to Services – Electricity/ Water 1. Can occur during excavation due to lack of information, knowledge and/or detailed execution plan/method statement. 1. Surveys shall ve carried out prior to commencement of any excavation work to establish any electricity/ water services, which may be present.

2. Contractors shall establish suitable and detailed execution plans & method statements for the proposed works and ensure all personnel involved are aware of how the work is to be carried out.

Inadequate Access/ Egress 1. Serious hazards can be presented if adequate access/egress is not provided such as falls of personnel or delayed escape in the event of an emergency. 1. Supervisors shall ensure that suitable means of access/egress is provided at predetermined points to enable personnel to enter and exit the excavation safetly.

 

Emergency Procedures 1. Serious accidents can occur if suitable emergency procedures have not been established prior to work commencement such as fire (cause by waste materials) and/or drowning (cause by burst water mains), etc. 1. Supervisors shall ensure that emergency procedures have been established prior to work commencement such as fire fighting equipment, first aid facilities and trained first aiders, etc.

2. Supervisors shall ensure that all personnel are aware of all emergency procedures that are in place (use practice drills if necessary).

굴착공사 중의 위험요인은 다양하게 분포되어 있으며, 각 현장 특성에 따라서 달라지고 있습니다.

내가 진행하는 공사 특성을 파악하고, 일반적인 위험요인과 특별관리가 필요한 위험요인을 찾아야 합니다. 

답은 언제나 현장에 있습니다~

캐시

Recent Posts

Policy – THE PURPOSE AND IMPORTANCE OF SETTING POLICY FOR HEALTH AND SAFETY

HEALTH AND SAFETY POLICY (a) Outline the purpose of the three main sections of an…

5일 ago

소음 – 청력 보호구

「산업안전보건법」에서는 1일8시간 작업을 기준으로 85dB 이상의 소음이 발생하면 소음작업으로 정의합니다. 과도한 소음이 발생하는 장소에서 작업을…

5일 ago

Policy – THE KEY ELEMENTS OF A HEALTH AND SAFETY MANAGEMENT SYSTEM

MANAGEMENT SYSTEM Describe the main components of a health and safety management system The main…

6일 ago

손전등는 어디에서 왔을까요?

▣ 손안의 안전한 빛, 손전등  손전등은 전구와 배터리를 이용하여 빛을 밝히는 휴대용 조명기구 입니다. 미국에서는…

6일 ago

업무상 재해 – 공상 처리 & 산재 처리

산업 현장에서 업무상 사고 발생 시 산재 신청을 할 것인지, 공상 처리를 할 것인지는 사업주와…

7일 ago

지적장애 그리고 에티켓

배려할 때 더 아름다워집니다 지적장애 그리고 에티켓 말아톤, 포레스트 검프, 아이엠 샘, 7번방의 선물, 나의…

1주 ago