▣ Overview of the Piping Design Management System

1) Design Requirements, Scope, and Specifications:
Verify the design requirements, scope of work, and special conditions outlined in the contract. Prepare design drawings, schedules, and progress management for comprehensive design work, establishing standards, procedures, and management techniques.

2) Planned Design Schedule:
The planned design schedule is organized by level and operates systematically, summarizing various information from lower-level tasks to higher levels.
     

– Level I: Main schedule showing timelines and tasks for design, procurement, construction, and commissioning.

– Level II: Summary schedule displaying interrelationships between unit tasks across the entire process.
– Level III: Baseline schedule serving as the basis for process management for each unit task.

3) Design Progress Management:
Establish criteria for determining the design progress rate based on the critical path affecting the entire process, assigning weights according to the characteristics of each unit design task.

4) Design Meetings:
To ensure efficient and prompt execution of design tasks, regular or ad-hoc meetings should be conducted to discuss and confirm overall design work.
   

Monthly Progress Meetings: Regular meetings to review and inspect the overall flow of design progress. Plans and progress should be documented and submitted on a monthly basis.

Weekly Progress Meetings: Regular meetings to document and discuss design progress and issues on a weekly basis.
     

Special Progress Meetings: Ad-hoc meetings to resolve specific design issues or problems, establishing solutions and countermeasures.

Meeting Minutes: Discussions from design meetings should be recorded in minutes for continuous review and monitoring until unresolved issues are settled.

▣ Planned Piping Design Schedule

1) Planned Design Schedule:
To ensure that the design work progresses according to the planned schedule, it should be organized by unit tasks.

2) Functions of the Planned Schedule:
The planned schedule serves the following functions from the perspective of process and progress management:
– Provides detailed schedules for each unit design task.
– Basis for calculating progress rates, analyzing performance, and forecasting progress.
– Basis for assessing the status of design progress and overall project progress.
– Provides related information linked with construction process management systems.
– Basis for reporting design progress.
– Reference for verifying the sequence of tasks between related departments or companies.

3) Operation of the Planned Schedule:
To systematically manage the schedule and submission of deliverables, a planned design schedule should be created and operated to ensure the design process progresses according to the planned schedule.

▣ Management of Design Progress Rate

1) Establishing and Distributing the Progress Rate Calculation Method:
To manage the design progress rate accurately, develop a progress rate calculation method, consult with the client, finalize, and distribute it to related departments (managed on a weekly and monthly basis).

2) Design Progress Rate Management Method:
Calculate the design progress rate by applying a weighted progress rate calculation standard, multiplying the achievement rate by the weighted value for each design task.

3) Design Progress Rate Calculation Standards:
Assign weight values to each unit task (Activity) and calculate the progress rate based on the achievement rate compared to the planned schedule.
     

Overview: The basic elements for calculating the design progress rate include the weighted value for each unit design task (Activity), the achievement rate of unit design tasks, and the progress rate.
     

Weight Value Setting: Weight values are assigned based on the manpower (M/H) required for each deliverable or the complexity and amount of each unit task. Weights are distributed among key deliverables.

▣  Review and Approval of Design Documents

1) Review and Approval of Design Documents:
Review and verify that design documents reflect all applicable codes, standards, design requirements, and conditions.

2) Types of Design Documents:
Basic Design Documents: Based on the basic plan and environmental impact assessment, these documents form the foundation for designing main equipment and auxiliary facilities and conducting technical evaluations.

Detailed Design Documents: Developed from basic design documents, these detailed documents include all necessary design information for manufacturing and construction, reflecting the characteristics of main and auxiliary equipment.

3) Submission Purposes for Design Documents:
– For Review and Reference: Submitted for pre-review and feedback before finalizing design documents to ensure efficient design execution.

– For Approval: Submitted after internal review and verification to obtain the client’s approval.

– Final or Construction Submission:  Submitted for construction purposes after obtaining final approval from the client, and provided to both the client and manufacturing or construction contractors.

4) Review Contents of Design Documents:
Design documents should be checked against a checklist, circulated among relevant departments for feedback, and, if necessary, verified by experts before submission.

▣ General Guidelines for Preparing Design Documents

1) Overview:
To standardize the preparation of design documents and drawings, establish minimum standards for format, notation, paper size, technical content, and units of measure.

2) Scope of Application:
Follow the same standards and procedures for issuing and revising various design documents and drawings.

3) Application Requirements:
 All companies must apply the same standards and procedures for preparing design documents and drawings, ensuring the following information is included in the Title Block (using SI Units):

     – Document and drawing number
     – Document and drawing title
     – Revision status and date
     – Project name, client name, and design service company name
     – Names or signature fields of the document/drawing preparer, reviewer, and approver

▣ Piping Design Drawings

1) Overview:
Design drawings, essential for plant construction, must meet minimum requirements for preparation and management.

2) Scope of Application:
All companies must follow the same standards and management system for preparing, issuing, and revising design drawings.

3) Classification by Drawing Purpose:
  – Design drawings are classified into three types based on their purpose:
  – Sketch Drawings: Document design concepts or research results (not formal drawings).
  – Preliminary Drawings: Issued for client consultation, review, or bidding purposes.
  – Design Drawings: Issued for manufacturing, installation, and construction purposes.

▣ Management of Piping Design Outsourcing

1) Overview:
To ensure high- quality deliverables, detail the outsourcing process, including scope of work, responsibilities, criteria for selecting and evaluating vendors, and management systems.

2) Key Considerations for Outsourcing Design Work:
Establish criteria for selecting the best vendors and thoroughly manage the review and approval of submitted design documents and drawings.

3) Management Plan for Design Outsourcing:
 – Develop a plan for managing outsourcing efficiently, focusing on quality and resource management.
 – Quality Management Plan: Ensure timely submission of high-quality design deliverables.
 – Resource Management Plan: Prevent changes in design personnel and involve qualified personnel in the design process.

4) Directions for Outsourcing Design Work:
   – Emphasize preventing design errors, improving quality, and adhering to the design process.
   – Maintain consistency in the scope of work and adherence to the design process.
   – Comply with the technical content of design standards.
   – Support effective personnel management and operation of the outsourcing company.
   – Empower the project manager with responsibility and authority, requiring weekly and monthly work reports.
   – Conduct design verification by experts to prevent errors and improve quality.
   – Foster horizontal cooperative relationships and minimize revision work on design content.

5) Pre-Evaluation of Design Outsourcing Companies:
Criteria for Selecting Design Outsourcing Companies:

– Expertise in the Field: Select vendors with expertise and a proven track record.
– Design Service Cost: Select vendors capable of performing within the design budget.
– Capability to Perform Services: Select vendors with the capability to perform design services.
– Contribution to the Company: Select vendors that prioritize company guidelines and performance.
– Client-Recommended Vendors: Select vendors recommended by the client for smooth execution.
– Pre-Evaluation Documentation for Design Outsourcing Companies:
     

Review the scope of work, quality improvement plans, similar project experience, technical staff and qualifications, dedicated design and quality assurance teams, and documentation required by other design service companies.

– Performance Evaluation and Management of Design Outsourcing Companies:
– Conduct quarterly evaluations to manage design outsourcing companies efficiently, assessing:
– Compliance with quality control procedures using checklists for design deliverables.
– Timely preparation and adherence to delivery schedules.
– Frequency and ratio of document revisions due to design errors.
– Technical level and turnover rate of design personnel.
– Compliance with the technical content of design guidelines.
– Proper execution of design instructions and work guidelines.

kassy

Recent Posts

푸꾸옥 여행 Tip.

베트남에 놀러간다면,  푸꾸옥을 놀러간다면 즐거운 여행에 첨가되는 라면스프 같은 소스를 소개합니다. 1. 라오몽 사오또이 동남아…

2일 ago

[20년만의] 마카오 야경

마카오 관광에서 가장 인상 깊다면 야경을 뽑을 수 있습니다. 남쪽 Cotai 지역만 이동하다보니 그렇게 느꼈을지…

6일 ago

비양도

제주도 서쪽 비양도라는 섬이 있습니다. .  비양도는 제주시 한림읍 비양리 위치해 있으며, 하늘에서 날오온 섬이라는 의미를 지니고 있습니다. 비양도는 한림항에서 약 1.1km 떨어져 있으며, 섬의 모양은 원형에 가깝고 약 2000여명의 주민이 거주하고 있습니다. 비양도의 중앙에는 해발 114m 높이의 비양봉 본석구가 있고, 서쪽 해안에는 제주도에서 가장 큰 초대형 화산탄들이 분포하고 있습니다. .  섬의 북쪽 해안에는 호니토(homito)로 알려진 굴뚝모양의 바위들이 약 20여기 분포하고 있다. 호니토는 용암이 흐르다가 습지 등의 물을 만나 수증기와 용암이 뒤섞여 분수처럼 솟구쳐 나와 쌓여 만들어졌으며, 천연기념물 제439호로 지정되어 있습니다. .  섬의 동쪽에는 펄렁못 엄습지와 마을 신당이 위치해 있습니다. 최근까지 비양도는 약 1,000년 전에 분출한 섬으로 알려져 왔으나 용암의 나이를 분석한 결과 27,000년 전에 형성된 것으로 조사되었습니다. . …

3주 ago

조용한 숲속, 원주 감악산

원주에 감악산을 다녀왔습니다. 강원도는 정말 등산을 가는 드라이브 코스부터 산과 계곡이 함께하기 때문에 설레임을 더해줍니다.…

3주 ago

비자림

자연이 살아있는 천년의 숲 비자림 제주 평대리 비자나무 숲 제주 평대리 비자나무 숲(비자림)은 한라산 동쪽에서…

1개월 ago

천연기념물 제420호, 성산일출봉

제주 동쪽 여행의 필수코스. 4년 전, 제주에 놀러왔는데 도착하고 태풍이 올라오고 있었습니다. 섭지코지의 문어빵을 무조건…

1개월 ago