Air flushing provides an efficient method of removing debris from pipelines and newly constructed systems.

  • In the gas process lines, the velocity should be the lowest figure between 60 m/s and the velocity obtained at 1.3 time the maximum process flow rate. The minimum velocity should be 30 m/s.
  • In liquid process lines, a velocity between 30 m/s and 60 m/s should be used.

Air Blowing 과 같이 청소을 목적으로 합니다. Air Blowingr과 Air Flushing의 차이라면 Air Blowing은 압력을 채워 한번에 배출하고, Air Flushing은 연속적으로 순환시켜 오염물질을 청소하는 것으로 이해하시면 될 것 입니다. 사용되는 방법으로 Air / Steam / Water / Manual / Pigging 등의 여러가지가 있습니다. 아래 JSA는 Air Blowing 큰 차이는 없으니 참고하세요.

Hazard Category Hazards Controls
Injury to Pesonnel and Property Damage 1. As a result of low safety awareness or incorrect information

2. Non compliance of safety regulation & procedures

1. Obtain correct PTW

2. Task supervisor to conduct pre-start meeting on daily basis and discuss all relevant hazard to the job with the crew and  what corrective action are required before/during and at completion of job and sign attendance sheet.

3. Task supervisor to explain JSA to all employees and sign attendances sheet

4. Confirm that procedures and other associated documents are approved and available.

Slips and Trips 1. Cause by inadequate access and poor visibility 1. Ensure proper wind up of hoses and housekeeping at work site.

2. All work areas are to be kept clean and free of tripping hazards.

3. The accessories (hoses & pump) not being used must be disconnected and store separately

4. Adequate lighting for night work is to be provided or when lighting is poor

Serious or Fatal Injury 1. Accidentally sudden release of air pressure & debris from discharge end of pipe or any valve spindle gland, gasket and flange

2. Defective tools can damage equipment and damaged equipment can leak due to high pressure

1. Barricade the area where air blowing test is to be carried out

2. Post warning signs

3. Appropriate PPE (Personnel Protective Equipment) such as safety helmet, safety glasses, leather gloves and safety shoes shall be worn by all employees

4. Ensure the equipment and tools to be used for air flushing (such as hoses, pump, couplings, pressure gauges, gasket etc.) are free from any defect and suitable for the pressure rating of the system

5. Whiplash arrestor must be installed with every joint of hose connector.

Stuck or Hit to personnel 1. Can occur sudden release of air pressure & debris 1. During the testing operation all non essential personnel will be kept out of the test area

2. Provide barricade and signages to prevent entry of unauthorized personnel

Physical Injury from flying debris 1. Flying foreign particles from pipe 1. Pressure gauge must be installed to monitor the allowable pressure

2. A screen should be provided at least 2 meter away from the open end pipe to protect the foreign particles to hit soneone.

3. The area must be cordoned off

 

kassy

Recent Posts

비자림

자연이 살아있는 천년의 숲 비자림 제주 평대리 비자나무 숲 제주 평대리 비자나무 숲(비자림)은 한라산 동쪽에서…

3주 ago

천연기념물 제420호, 성산일출봉

제주 동쪽 여행의 필수코스. 4년 전, 제주에 놀러왔는데 도착하고 태풍이 올라오고 있었습니다. 섭지코지의 문어빵을 무조건…

3주 ago

제주 청굴물

청굴물 청굴물이 위치한 동네 이름은 청수동인데, 청수동의 원래 지명은 청굴동이다.  청굴물은 용압대지 하부에서 지하수(용천수)가 솟아나는…

3주 ago

[20년만의] 마카오 – 주하이 여행

마카오는 특별행정구역으로 구분되어 있습니다. 지금은 중국과 비자 면제가 되어 있지만, 사실 얼마전까지만 해도 중국에 입국하려면…

3주 ago

외국인 근로자의 우울증

보통 외국인 근로자, 외국인 노동자라고 하면 한국 사람들이 기피하는 3D산업에만 종사하는 외국인으로 생각하기 쉽지만 외국인…

3주 ago

배관설계 계획 수립

▣ 개요 및 적용 범위 1) 개요 각 역무 수행 주체와 적용 범위, 설계 추진방향…

3주 ago