16. HDPE Installation

High-density polyethylene (HDPE) is an extremely versatile material that is utilized for a number of engineering works.

As one of the most versatile plastic materials around, HDPE plastic is used in a wide variety of applications, including plastic bottles, milk jugs, shampoo bottles, bleach bottles, cutting boards, and piping. Known for its outstanding tensile strength and large strength-to-ensity ratio, HDPE plastic has a high-impact resistance and melting point.

Hazard Category Hazards Controls
Injury and Damage 1. Cause by poor communication between worker parties 1. Secure and apply all PTW support documents prior to start the job and kept in one folder

2. Conduct TBM (Tool Box Meeting) and discuss the JSA & work procedure with employees

3. All personnel will wear the appropriate PPE for their specific task

4. Work force has good understanding of task and working to the approved JSA and permit requirement

Injury to personnel 1. Non compliance of safety and HSE procedure during installation of HDPE lining 1. Listen to the instruction of engineer or supervisor in charge and follow the procedure and ensure that the area is free from obstruction

2. Supervisor & foreman must teach the worker how to right positioning of cutting and use gloves for cutting

3. Proper position of manual lifting to prevent back injury

Electrocution, Eye irritation and Skin Burn 1. Lack of safe awareness during electric welding 1. Supervisor must give the instruction of the  worker before the start of the activities

2. Ensure that the grounding cable are installed and perperly grounded

3. Only certified welder having certification for specific job shall be allowed to perform welding job 

4. Work personnel shall wear PPE such as gloves and goggles

5. Work personnel do not away from welding equipment prior to completed work

6. All electric welding equipment will be kept in good repair and used only for the intended purpose

7. Tools must be properly stored when not in use

8. All electrical operated tools shall be double insulated grounded and shall be rated at 220 volts and portable power tools must be equipped with proper function “Dead man switch”

Sips and Trips 1. As poor housekeeping
2. Can cause by inadequate storage materials
1. Good housekeeping a place for everything and all   materials must be keeping right place

2. Materials not obstruction for access

3. Arrange all the materials in neat orderly manner

4. Remove al damage meterial and dispose of properly

저의 경우, 주로 물배관으로 사용되는 배관라인과 Tank 주변 Dike 내부 바닥에 지반침투방지용으로 접했습니다. 

대부분 열을 가해서 접합해야 하며 다루기가 용이하죠!! 전원선 상태 확인 및 다림질과 같은 작업방법의 경우는 화상 상해에 주의해서 작업해야 할 것 입니다.

HDPE도 지중매설된 것들이 많습니다. 터파기할 때 조심하셔야 합니다.

제가 근무한 현장은 물배관을 너무 많이 터트려서 물바다 많이 되었습니다 ^^;;;;

kassy

Recent Posts

베트남 – 콘다오 Con Dao

콘다오 Con Dao. 호치민에서 남쪽으로 2~3시간을 버스를 타고 달려가면 Baria-VungTau 도시를 만날 수 있습니다. 바리아-붕따우에서…

6일 ago

장기사용 김치냉장고 화재

오늘 아침식사에도 지난해 담근 김치가 너무 맛있어서 먹을 때마다 감탄을 자아낸다. 이렇게 맛있는 김치를 유지할…

1주 ago

어린이 사고 연령대별 불안전사고 유형과 예방법

‘아차!’ 순간 발생하는 어린이 사고 아이들의 야외활동이 많아지는 방학. 추운 날씨에도 아랑곳하지 않고 뛰어노는 아이들은…

1주 ago

세계 최초의 방탄조끼 ‘면제배갑’

조선 시대에 만들어진 세계 최초의 방탄조끼 ‘면제배갑’ 1871년 신미양요 당시, 절대적인 열세 속에서 조선군을 보호해준 유일한…

2주 ago

조엘마 빌딩 화재사고

조엘마 빌딩은 브라질 상파울루 시내 중심에 1971년 건축된 25층 빌딩이었다. 은행, 변호사 사무실 등이 있는…

2주 ago

작업 전 안전미팅 (TBM, Tool Box Meeting)

작업 전 안전미팅(TBM)은 현장에서 소규모로 단시간에 진행하는 회의로 안전 확보를 위한 세부 작업방법 등을 논의하고…

2주 ago