What safety precautions must be taken during the installation of pipe?

8 Critical Pipeline Safety Precautions to Consider
  • Carry Out Frequent Safety Training. …
  • Foster a Corporate Safety Culture. …
  • Ensure Proper Pipeline Excavation Procedures. …
  • Use Appropriate and Adequate PPE While Working Onsite. …
  • Ensure Adequate Training for Operators of Heavy-Duty Machinery. …
  • Inspect all Tools Used Onsite.

When completing work on site pipe fitters are exposed to many new hazards and hazardous actives that are not encountered while pipe fitting in a work shop environment:

  • Performing hot works in explosive atmospheres (i.e. solvent or dust laden atmospheres)
  • Tying into live piping systems  Working at heights, off ladders or scaffolds
  • Working in confined spaces, trenches or excavations
  • Construction plant and equipment moving around site
  • Working close by to suspended loads and lifting equipment
  • Being exposed to buried services and or electrical cables

Hazard Category Hazards Controls
Starains and Sprians 1. During handling and installation of pipework strains and back injuries are not uncommon 1. Toolbox talks shall be held and risks highlighted.

2. Pipework shall be located as close to worksite as possible using a mechanical handling device. 

3. When erecting pipework manual handling shall be avoided (wherever possible) a mechanical handling device shall be used. 

4. Manual handling assessments shall be carried out to identify particular hazards associated with piping installation and the precautions required to reduce the risks of personal injury. 

Fire 1. Caused by poor housekeeping, inadequate fire protection and failure to isolate and purge pipework. etc. 1. Connecting the pipework shall be isolated, flushed and purged as required.

2. All combustible material shall be removed from worksite prior to commencing hotwork. 

3. Personnel shall be aware of others in the vicinity. (Conflicting Activities.) 

4. A fire hose of fire extinguisher shall be in place prior to work. 

5. In areas where further protection is required, i.e. Cable racks, etc. Fire blanket shall be used. 

6. Fire watcher shall be on site at all times during hotwork operations. 

7. Personnel shall read and adhere to permit requirements at all times. 

8. Gas detector shall be used prior to Hot work to ensure atmosphere is safe. 

Falls of Materials and Tools 1. Contact will sharp/slivers of metal can result in cuts to the skin. Exotic particles are also known to be carcinogenic. 1. Personnel shall wear gloves at all times when handling exotic materials.

2. Heavy materials shall be moved by mechanical handling devices (where possible). 

3. Personnel shall ensure that all cuts are treated immediately by a trained first aider. 

4. Personnel shall seek medical assistance immediately if cuts, etc. Become infected. 

Faulure of Lifting, Equipment 1. Caused by lack of maintenance, equipment being abused and by incorrect use of equipment. 1. Color coding and test certificates of equipment shall be checked to ensure they are in date.

2. All equipment shall visually inspected prior to use ensure it is free from any defect/damage. 

3. All damaged/ defective equipment shall be marked with “Do not use” tape and returned to the stores. (Quarantine area immediately) 

4. All equipment shall be adequate rating to perform operation. 

5. All equipment shall be set up as per operationall instruction and codes of practice. 

Cuts and Abrasions 1. Caused by incorrect handling of tools, equipment and pipework and by failure to wear the correct personal protective equipment. 1. When bolting or unbolting pipework, spanners of the correct size shall be used to aboid spillage.

2. When using hammes, etc. for tightening, a sound footing shall be maintained, be aware of sorrounding obstructions. 

3. Personnel shall never put hands or fingers between flanges or pipe ends. 

4. Gloves shall be worn at all times to protect the hands when handling materials. 

Uncontrolled lifts 1. Uncontrolled lifts can cause damage to personnel, plant and equipment. 1. Pigging shall be located directly above items to be installed (where possible).

2. Existing equipment shall be protected during the installation process. 

3. Shall be barriered off to prevent access to unauthorised. 

4. If in doubt ask your supervisor 

5. Toolbox talk shall be carried out prior to work commencement to ensure that all personnel are aware of their resonsibilities. 

다양한 위험요소를 갖고 있는 배관 설치 작업은 플랜트 공사의 Main 작업입니다.

다양한 사이즈의 구경, 길이, 재료 등에 따라서 작업 방법이 달리하고 있습니다.

General 한 사항들을 기준으로 일반적인 JSA 내용이지만, 추가 사항에 대하여 다른 부분의 JSA 도 활용하셔야 좀 더 세부적인 위험성평가 자료를 준비하실 수 있습니다.

감사합니다.

kassy

Recent Posts

비자림

자연이 살아있는 천년의 숲 비자림 제주 평대리 비자나무 숲 제주 평대리 비자나무 숲(비자림)은 한라산 동쪽에서…

1주 ago

천연기념물 제420호, 성산일출봉

제주 동쪽 여행의 필수코스. 4년 전, 제주에 놀러왔는데 도착하고 태풍이 올라오고 있었습니다. 섭지코지의 문어빵을 무조건…

2주 ago

제주 청굴물

청굴물 청굴물이 위치한 동네 이름은 청수동인데, 청수동의 원래 지명은 청굴동이다.  청굴물은 용압대지 하부에서 지하수(용천수)가 솟아나는…

2주 ago

[20년만의] 마카오 – 주하이 여행

마카오는 특별행정구역으로 구분되어 있습니다. 지금은 중국과 비자 면제가 되어 있지만, 사실 얼마전까지만 해도 중국에 입국하려면…

2주 ago

외국인 근로자의 우울증

보통 외국인 근로자, 외국인 노동자라고 하면 한국 사람들이 기피하는 3D산업에만 종사하는 외국인으로 생각하기 쉽지만 외국인…

2주 ago

배관설계 계획 수립

▣ 개요 및 적용 범위 1) 개요 각 역무 수행 주체와 적용 범위, 설계 추진방향…

2주 ago